INTRODUCTION
For the power generation with 2x110 MW, 3x210
MW and 2X195 MW of K.S.T.P.S. authorities are required to be operative to
active full operation. The auxiliaries are basically operation either on L.T.
System i.e. 415 V 3-Ø power supply is made available to the system after
providing the station transformer of 3x50 MVA capacity with voltage 220
KV/ 7.2/7.2 KV & different service transformers of capacity 1.0 MVA, 1.5
MVA, 2.0 MVA, which are located near the load centre as the transformer
having the voltage of 6.6 KV /415 V. The 6.6 KV power is distributed
through 6.6 KV interconnected Bus System for all the five units with a
control through DC of 220 V.

    Attachment Lists

    If download doesn't start in application like IDM then press Alt + click on download button to start download
  • KSTPS-Traning-Report.pdf (Size: 1962.83KB) Dowland
Share With Friends :  

No any Comment yet!